Rear and wet-kitchen works
Rear extensions, wet kitchens, service areas and the relationship between new works, existing drainage and roof junctions.

Additions and alterations (A&A) can look simple on a floor plan while touching structure, drainage, waterproofing, facade or authority requirements in practice. LIMM starts with the existing property and the intended change before promising a construction path.
The first conversation is more useful when the site context and household or business priorities are visible before details are fixed.
The exact work depends on the property, but these are the connected areas that usually shape the review.
Rear extensions, wet kitchens, service areas and the relationship between new works, existing drainage and roof junctions.
Shelters, gates, access, surface falls, drainage, vehicle movement and the connection back to the main house.
Usable-area improvements with attention to weather exposure, waterproofing, neighbours and the existing building envelope.
Glazing, doors, windows, facade refreshes and other external changes reviewed against actual site and approval needs.
The label affects the checks, professional team and programme. It should follow the actual proposal—not be chosen because one route sounds faster or cheaper.
Work largely within the approved house can still involve serious coordination, but may not alter the building form, add gross floor area or trigger the same planning route as an extension.
A&A may include additions or changes to the existing landed house, provided the proposal remains within URA's prevailing A&A criteria and other applicable requirements.
A proposal that falls outside URA's A&A criteria, adds a storey or changes the landed housing form is treated differently and requires the corresponding professional and approval route.
Approved GFA, external walls, structural changes, roof works, the existing envelope and previous approvals all matter; the visible size of an extension alone is not enough.
Send the approved or existing plan, site photos and the alteration you want. LIMM can identify the questions that need to be resolved before the working scope is fixed.
The required architect, engineer, qualified person or authority submission depends on the property and proposed works. These roles should be identified clearly rather than hidden inside vague promises.
A rear kitchen, car-porch change and additional storey are fundamentally different projects. These factors explain why a generic online rate or duration is rarely decision-ready.
Available plans, previous additions and non-conforming or undocumented work can affect the information and professional review needed first.
Openings, columns, beams, slabs, foundations and the way new work meets the existing house can change both design and construction scope.
Extensions create junctions. Roof falls, waterproofing, stormwater paths, platform levels and exposed boundaries need coordinated details.
Professional appointments, authority review, neighbour-sensitive work, temporary protection, procurement and site access shape the realistic programme.

Entry, glazing and external-transition details considered together with access, weather exposure and the existing house condition.
URA's current A&A criteria consider additional GFA, external-wall replacement, structural changes, roof works and attic additions. Proposals outside those criteria, an added storey or a change in landed housing form are treated as reconstruction.
Official requirements can change. Links below point to the current official pages and open in a new tab.Current additions-and-alterations criteria and treatment of proposals that become reconstruction.
Open official guidance ↗Urban Redevelopment AuthorityThe corresponding prevailing criteria for semi-detached landed housing.
Open official guidance ↗Urban Redevelopment AuthorityA homeowner-oriented overview of common landed alterations and planning-permission examples.
Open official guidance ↗The process stays cautious where the site or requirements need deeper checks, while keeping the next practical decision visible.
Share the existing plan, site photos, desired extension or alteration, and what the new space needs to achieve.
LIMM surfaces structural, planning, drainage, roofline and access questions that need to be resolved.
Where applicable, professional review and submissions are arranged before the construction scope is treated as approved.
Design intent, construction details, cost drivers and programme are aligned for the next stage.
Renovation may improve the existing house without deeply changing the building, while A&A can add or alter areas in ways that affect structure, external form or authority requirements.
No. Photos and plans support an initial discussion, but approval and feasibility depend on the property, proposed work and required professional or authority checks.
No. Requirements vary with the scope and property. The correct route should be established from the actual proposal rather than assumed from size alone.
Share the existing and approved plans if available, current site photos, the intended addition or alteration, known leaks or drainage issues, household priorities, budget range and preferred timing. Previous approval records are especially useful for an older or already-altered house.
A plan can support an initial discussion, but a reliable construction scope normally needs the existing condition, structural and approval questions, specifications, access and key details to be understood. Missing assumptions should be identified before detailed costing.
There is no single responsible duration for all A&A projects. The programme depends on design development, investigations, professional appointments, submissions and approvals where required, structural and drainage scope, procurement, site access and construction sequencing.
Plan the approved footprint, structure, roof junctions, drainage, ventilation, services and construction access before cabinetry is designed.
Read note ↗Landed & A&A · 8 min readA practical guide to renovation, additions and alterations, reconstruction criteria and the checks landed homeowners should make before committing.
Read note ↗Planning & approvals · 9 min readAn answer-first guide to plans, wall type, structural review, concealed services and property-specific approval before demolition starts.
Read note ↗Include the property type, rough scope, known issues, budget range and preferred timeline.
Start project review