Bathroom renovation with the hidden wet works planned first.

Tiles and sanitary fittings are the visible layer. Preparation, drainage falls, waterproofing transitions, penetrations and service access are the parts that need to be resolved before the finish closes them in.

01
Our approach

A practical bathroom balances water management, safe movement, usable clearances, ventilation, storage and cleaning—not only the material palette.

The first conversation is more useful when the site context and household or business priorities are visible before details are fixed.

Scope

Wet-area decisions that need to work together

The exact work depends on the property, but these are the connected areas that usually shape the review.

01

Layout and clearance

Shower, WC, vanity, door swing, screens and circulation reviewed against actual site dimensions.

02

Waterproofing and drainage

Preparation, falls, outlets, junctions and penetrations coordinated before the visible surfaces are completed.

03

Plumbing and ventilation

Pipe condition, fitting positions, water points, ventilation and access considered with the intended layout.

04

Fittings and storage

Mixers, sanitary ware, mirrors, lighting, niches and cabinets aligned with maintenance and everyday use.

Planning checks

A new layout must be tested against the real wet area

Moving fixtures can affect drainage, floor levels, structure and property requirements. Feasibility should be checked before the new arrangement is treated as fixed.

  • Existing leaks, dampness, drainage or pipe concerns
  • Proposed changes to WC, basin, shower or floor levels
  • Door, screen and sanitary-fitting clearances
  • Ventilation, lighting, sockets and water-heater coordination
  • Testing and trade sequence before surfaces are closed
Completed bathroom vanity and shower area
Completed LIMM Works project · Bathroom renovation

Bathroom wet-area coordination

Waterproofing, drainage, sanitary fittings, access and ventilation reviewed before the visible finishes are finalised.

WaterproofingDrainageFittings
View this completed project
Initial project review

A clearer path from first message to working scope.

The process stays cautious where the site or requirements need deeper checks, while keeping the next practical decision visible.

01

Review the existing wet area

Share photos, dimensions, known defects, intended layout and the fittings under consideration.

02

Check layout feasibility

Drainage, levels, penetrations, clearances and property requirements are surfaced before details are fixed.

03

Coordinate below the finish

Plumbing, preparation, waterproofing and testing are sequenced ahead of tiling and installation.

04

Confirm visible details

Tile set-out, sanitary fittings, screens, vanity, lighting and accessories are aligned with the site dimensions.

Frequently asked

Questions to settle early.

Can the WC or shower be moved anywhere?

No. Drainage, structure, levels and property requirements can restrict fixture moves. The actual wet area needs to be reviewed.

When should the shower screen be measured?

Final measurements should be taken after the surrounding surfaces are sufficiently complete and the actual opening is known.

Is waterproofing visible at handover?

Most of it is not, which is why the preparation, application, transitions and testing sequence should be discussed before finishes cover the work.

Start with practical context

Send the floor plan and current site photos.

Include the property type, rough scope, known issues, budget range and preferred timeline.

Start project review
WhatsApp your floor plan